I compacted the dirt. Installed MY 2x8 FORMS. So fuck the Contractor and The Horse he hasn't road in on. I will do the JOB MYSELF. The end is open for my backhoe to dump the 4 inches of gravel which I will spread. Then Compact it. After which I will add wire mesh. And FINALLY I will call for 4 inches of CONCRETE which I will spread like Peanut Butter.

No comments:
Post a Comment